Our Portfolio
![Screenshot 2023-01-13 at 12.19.06.png](https://static.wixstatic.com/media/af38b2_e70099c06bf04634a49ce81fd8819778~mv2.png/v1/fill/w_289,h_36,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/Screenshot%202023-01-13%20at%2012_19_06.png)
Serving as the first project for Rainbird Crane Services, we provided the whole lifting team: tower crane operators, crane supervisors, slinger/signallers & an appointed person
![](https://www.rainbirdcraneservices.co.uk/wp-content/uploads/2024/03/af38b2_21fe544234dc49fbb999e8610e6fb147mv2-1.webp)
Hartlebury Energy From Waste Power Station
![Screenshot 2023-01-13 at 12.18.09.png](https://static.wixstatic.com/media/af38b2_62334625fbd14a5ca9fbb4099c239c10~mv2.png/v1/fill/w_165,h_62,al_c,lg_1,q_85,enc_auto/Screenshot%202023-01-13%20at%2012_18_09.png)
Rainbird Crane Services supplied the
operator on Europe’s heaviest lifting tower
crane (128t at 15m radius).
Lifting operations on site included mobile
crane tandem lifting and mid-air load
transfers onto the tower crane.
Serving every contractor
on the project, we have
successfully delivered
millions of pounds of
machinery and plant.
Serving as the go-to
individual on-site, Rainbird Crane Services also supplied specialist labour to every contractor! on the U.K’s most sustainable office tower
![Screenshot 2023-01-10 at 12.21.06.png](https://static.wixstatic.com/media/af38b2_e62b68625cbd453a8514629b51d41763~mv2.png/v1/fill/w_163,h_114,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/Screenshot%202023-01-10%20at%2012_21_06.png)
8 Bishopsgate
On The U.K’s Most Sustainable Office Tower
![Screenshot 2023-01-10 at 12.21.06.png](https://www.rainbirdcraneservices.co.uk/wp-content/uploads/2024/03/Screenshot-2023-01-13-at-12_16_57-1.webp)
Working alongside Mace, we provided an Appointed Person to deliver the hugest footprint in Europe. The project required tracking plant half a mile to the install position.
Battersea Power Station
![Screenshot 2023-01-10 at 11.45.25-1.webp](https://www.rainbirdcraneservices.co.uk/wp-content/uploads/2024/03/Screenshot-2023-01-10-at-11_45_25-1.webp)
At Deptford Landings we are currently lifting a total of 361 POD’s… With varying dimensions & unusual lifting point locations.
RCS designed, then manufactured, a bespoke lifting frame – capable of lifting every POD without reconfiguration!
A great practical solution that has ensured speed & safety when unloading & lifting POD’s
8 Bishopsgate
![Screenshot 2023-01-13 at 12.19.06.png](https://static.wixstatic.com/media/af38b2_e70099c06bf04634a49ce81fd8819778~mv2.png/v1/fill/w_289,h_36,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/Screenshot%202023-01-13%20at%2012_19_06.png)
Serving as the first project for Rainbird Crane Services, we provided the whole lifting team: tower crane operators, crane supervisors, slinger/signallers & an appointed person
Book a Free Consultation
details of your upcoming project that
requires specialist lifting services. We will
arrange a free consultation to understand
your lifting requirements before submitting
our proposal.